![]() | |||||
| |||||
|
![]() |
![]() Refuge "Hospital de Vielha" situated in South portal of tunnel. |
OLD WAY TO
THE ARAN VALLEY (VAL D'ARAN) |
r | ![]() At 1948, the Vielha tunnel was world's longest road tunnel |
LIFE CHANGE IN THE ARAN VALLEY The communication with Spain becomes reality. The works of construction prolonged for more than 22 years. Finally the primitive idea of Paschal Madoz is reality. |
![]() |
![]() Tunnel view in 1960 |
VIELHA TUNNEL IN THE PAST Vielha Tunnel with 5260 m of length allows the communication of Ribagorza and Aran Valley regions. |
![]() |
![]() Actual view of North portal of tunnel |
NORTH PORTAL OF TUNNEL
The North portal of tunnel is situated to 1400 m.a.s.l., It's near to confluence of port gully with the Nere river. Also it's situated next of actual center control. |
![]() |
![]() M Actual view of South portal of tunnel. |
SOUTH PORTAL OF TUNNEL
The South portal of tunnel is situated in the head of Barrabes Valley. The portal of tunnel is to 1605 m.a.s.l. |
![]() |
![]() Provisional parkings for trucks. |
TRAFFIC LIGHTS FOR THE TRUCKS The security in the tunnel is very low due to the increase of the traffic of heavy vehicles. Two parkings in both portals regulates the passage of trucks. |
![]() |
|
CENTER CONTROL The old control center will be demolished. in the North portal is being constructed a new control center. |
![]() |
![]() Champán para celebrar la unión de ambos frentes |
UNIÓN DE LAS OBRAS DE LOS DOS
PAÍSES En julio,. |
![]() |
![]() Jo |
EA ESTÁ HECHO Fin . |
![]() |
![]() Se revisaron los sistemas |
LAS MERCANCÍAS Reunión |
|
![]() El túnel, ya finalizado, aguarda su apertura |
SUPERADA Con el túnel |
|
![]() Pruebas |
FIJADA LA FECHA FINAL: El túnel será por fin una realidad práctica a partir del |